|
EDM Calculator
Please scroll
through the below Product & User support information:
EDM Calculator -
Whole Circle Bearing
This
calculates the 'Horizontal Distance & Bearing' to any 'Target
Points', using the 'Instrument Set Up Point', as the point of origin.
|
|
|
Station |
Northing |
Easting |
Horizontal Dist |
WCB |
|
Input
Target Point Ref |
Input
the Northing of Target Point |
Input
the Easting of the Target Point |
The
Horizontal Distance (m) is calculated |
The
Bearing (000'00'00")
is calculated |
|
|
|
|
|
Press
onto 'Run Calcs'
EDM Calculator
- Straight Road/Line
This
calculates the 'Northings & Eastings' along the Centre Line, at
any Chainage, from any Start Point (TP1) to any Finish Point (TP2).
The 'Northings
& Eastings' to any offset widths to the Right & Left of the
Centre Line which are at 90 degrees to the Centre Line.
The
'Horizontal Distance & Bearing' to any of the above 'Chainage
Centre Line Points & Offset Points', using the 'Instrument Set Up
Point', as the point of origin.
The WCB of the
Line and the Length of the Line
Data
Input Fields:
|
Site: |
Input
your Site or Job Reference |
|
EDM Northing: |
Input
the Northing of the Instrument Set Up Point |
|
EDM Easting: |
Input
the Easting of the Instrument Set Up Point |
|
Start Northing: |
Input
the Northing of your Start Point (TP1) |
|
Start Easting: |
Input
the Easting of your Start Point (TP1) |
|
Finish Northing: |
Input
the Northing of your Finish Point (TP2) |
|
Finish Easting: |
Input
the Easting of your Finish Point (TP2) |
|
Start Chainage: |
Input
the Start Chainage at TP1 |
|
1st Chainage: |
Input
the 1st full chainage required after the Start Chainage |
|
Chainage Gap: |
Input
the Chainage Gaps required after the 1st Chainage |
|
Left Offset: |
Input
the required Left Offset Width |
|
Right Offset: |
Input
the required Right Offset Width |
|
|
Press
onto 'Run Calcs'
|
Chainage |
Position L/C/R |
Northing |
Easting |
Horizontal Dist |
WCB |
|
Chainage
Position is noted |
Left,
Centre, or Right |
The
Northing of the Left, Centre or Right Offset Position is calculated |
The
Easting of the Left, Centre or Right Offset Position is calculated |
The
'Horizontal Distance' from the Instrument Set Up Point to the Left,
Centre or Right Offset is calculated |
The
'Bearing' from the Instrument Set Up Point to Left, Centre or Right
Offset is calculated |
|
|
|
|
|
|
|
Road WCB |
The
WCB from TP1 to TP2 is calculated |
|
Road Length |
The
Length of Road from TP1 to TP2 is calculated |
|
End Chainage |
The
End Chainage at TP2 is calculated |
EDM Calculator
- Circular Road/Curve
This
calculates the 'Northings & Eastings' along the Centre Line at
any Chainage, from any Start Point (TP1) to any Finish Point (TP2)
for any Radius.
The 'Northings
& Eastings' to any offset widths to the Right & Left of the
Centre Line which are at 90 degrees to the Centre Line and the Radial Point.
The
'Horizontal Distance & Bearing' to any of the above 'Chainage
Centre Line Points & Offset Points', using the 'Instrument Set Up
Point', as the point of origin.
The Approach
Bearing, the Exit Bearing, the Length of Curve, Long Chord, Rise,
Co-ordinate Value of the Curve Centre & Deflection Angle.
Data
Input Fields:
|
Site: |
Input
your Site or Job Reference |
|
EDM Northing: |
Input
the Northing of the Instrument Set Up Point |
|
EDM Easting: |
Input
the Easting of the Instrument Set Up Point |
|
Start Northing: |
Input
the Northing of your Start Point (TP1) |
|
Start Easting: |
Input
the Easting of your Start Point (TP1) |
|
Finish Northing: |
Input
the Northing of your Finish Point (TP2) |
|
Finish Easting: |
Input
the Easting of your Finish Point (TP2) |
|
Start Chainage: |
Input
the Start Chainage at TP1 |
|
1st Chainage: |
Input
the 1st full chainage required after the Start Chainage |
|
Chainage Gap: |
Input
the Chainage Gaps required after the 1st Chainage |
|
Left Offset: |
Input
the required Left Offset Width |
|
Right Offset: |
Input
the required Right Offset Width |
|
Radius: |
Input
the Radius (m) |
|
Curve Type: |
Choose
either a Left Based Curve or Right Based Curve |
|
|
Press
onto 'Run Calcs'
|
WCB |
The
WCB from TP1 to TP2 is calculated |
|
Long Chord |
The
Long Chord from TP1 to TP2 is calculated |
|
Deflection Angle |
The
Deflection Angle is calculated |
|
Rise |
The
Rise is calculated |
|
Curve Length |
The
Curve Length from TP1 to TP2 is calculated |
|
End Chainage |
The
Chainage at TP2 is calculated |
|
Approach |
The
Approach Bearing is calculated |
|
Exit |
The
Exit Bearing is calculated |
|
Northing |
The
Northing of the Curve Centre is calculated |
|
Easting |
The
Easting of the Curve Centre is calculated |
|
Chainage |
Position L/C/R |
Northing |
Easting |
Horizontal Dist |
WCB |
|
Chainage
Position is noted |
Left,
Centre, or Right |
The
Northing of the Left, Centre or Right Offset Position is calculated |
The
Easting of the Left, Centre or Right Offset Position is calculated |
The
'Horizontal Distance' from the Instrument Set Up Point to the Left,
Centre or Right Offset is calculated |
The
'Bearing' from the Instrument Set Up Point to Left, Centre or Right
Offset is calculated |
|
|
|
EDM Calculator
is a trademark of RAI Technical Ltd |
|
quDesigned
by RAI Computing Services Ltdrld |
|
|